
BA 357-00 * 3.0 * 35700_07_Wartung.fm
7-69
Maintenance 7
The road traffic module is installed under the operator seat.
The fuses are located under the cover
A
of the road traffic module.
Fuse assignments
– see chapter 9 “Road traffic module” on page 9-13
Removing a fuse
1. Lower the loader unit.
2. Apply the parking brake.
3. Actuate the motor isolating switch.
4. Turn the machine off and remove the ignition key.
5. Open the battery cover plate.
6. Disconnect the battery connector.
7. Folding the operator seat forwards.
8. Unscrew the fastening screws of the cover.
9. Take off cover
A
from the fuse box.
10.Remove the defective fuse.
Installing a fuse
1. Insert the new fuse.
➥
Descriptions and output indications
– see chapter 9 “Fuses” on page 9-11
2. Close the fuse box again.
3. Fold back the operator seat and re-secure it.
4. Connect the battery connector.
5. Close the battery cover plate.
6. Turn on the machine.
7. Check the electrical system for correct function.
Fig. 251
A
Summary of Contents for KRAMER 5055e
Page 12: ...1 6 BA 357 00 3 0 35700_01_Vorwort fm 1 Preface Notes...
Page 36: ...2 24 BA 357 00 3 0 Sicherheit_E fm 2 Safety Notes...
Page 98: ...4 26 BA 357 00 3 0 35700_04_Inbetriebnahme_01 fm 4 Putting into operation...
Page 252: ...6 12 BA 357 00 3 0 35700_06_Transport fm 6 Transport Notes...
Page 264: ...7 12 BA 357 00 3 0 35700_07_Wartung fm 7 Maintenance Maintenance label Affixed on the cabin...
Page 340: ...7 88 BA 357 00 3 0 35700_07_Wartung fm 7 Maintenance Notes...
Page 382: ...8 42 BA 357 00 3 0 35700_08_Betriebsst rung fm 8 Malfunctions...
Page 408: ...9 26 BA 357 00 3 0 35700_09_Technische_Daten fm 9 Technical data...
Page 416: ...S 8 BA 357 00 3 0 BA_35700_V3_enSIX fm Index...
Page 417: ...BA 357 00 3 0 BA_35700_V3_enSIX fm S 9 Index...
Page 418: ...S 10 BA 357 00 3 0 BA_35700_V3_enSIX fm Index...