
7-6
BA EZ17 en* 1.1 * ez17w700.fm
7 Maintenance
Maintenance schedule of Lehnhoff mechanical quickhitch system
Other maintenance intervals (Wacker Neuson service center):
• Every 250 hours of operation or semi-annually
• Every 500 operating hours or annually
For additional details contact a Wacker Neuson service center.
L
L
L
M
M
G
H
H
J
L
L
K
K
Symbolic representa-
tions
Quick coupler system MS01 maintenance (operator)
Interval
1
Perform visual inspection of the quickhitch system
--
10 hours of operation/
daily
Clean bolt guide
G
50 hours of operation/
weekly
Clean the bolt contact surface
H
50 hours of operation/
weekly
Clean bottom side of the quick coupler system
J
50 hours of operation/
weekly
Clean contact surfaces of the attachment
K
50 hours of operation/
weekly
Clean the opening for the socket wrench and bores of the attachment support
L
50 hours of operation/
weekly
Clean bolt attachment support
M
50 hours of operation/
weekly
1.
For time specifications: the first achieved time specification is decisive. If the situation requires it, perform maintenance if necessary, even if the maintenance
interval has not yet been reached.
Summary of Contents for E13-01
Page 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Page 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Page 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Page 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Page 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Page 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Page 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Page 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...