
5-36
BA EZ17 en* 1.1 * ez17b510.fm
5 Operation
Setting down an attachment
1. Screw in the attachment and position it at 5 – 10 cm (2 – 4 in) above
the ground.
2. Shut off the engine and store the ignition switch key safely.
3. Turn the socket wrench
D
counter-clockwise until the bolts
E
are
completely retracted.
➥
The quick coupler system is unlocked.
4. Remove the socket wrench.
5. Start the engine.
6. Lower the attachment to level and firm ground ensuring stability.
7. Retract the bucket cylinder and quick coupler system
A
from the
attachment bolt
B
.
Fig. 128
Fig. 129
E
D
Fig. 130
B
A
Summary of Contents for E13-01
Page 6: ...EG 2 BA EZ17 en 1 1 ez17konf fm Declaration of conformity Notes...
Page 36: ...2 22 BA EZ17 en 1 1 Safety_01_0 fm 2 Safety Notes...
Page 45: ...BA EZ17 en 1 1 ez17e300 fm 3 9 Introduction 3 Warning labels...
Page 50: ...3 14 BA EZ17 en 1 1 ez17e300 fm 3 Introduction Labels...
Page 90: ...4 36 BA EZ17 en 1 1 ez17i400 fm 4 Putting into operation Notes...
Page 158: ...5 68 BA EZ17 en 1 1 ez17b510 fm 5 Operation Notes...
Page 216: ...7 50 BA EZ17 en 1 1 ez17w710 fm 7 Maintenance Notes...
Page 220: ...8 4 BA EZ17 en 1 1 ez17b800 fm 8 Malfunctions Notes...
Page 244: ...9 24 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Dimensions Fig 243...
Page 246: ...9 26 BA EZ17 en 1 1 ez17t900 fm 9 Technical data Notes...