wc_tx003058gb.fm
37
DS 70
Maintenance
5.5
Checking the Fuel Lines and Fittings
When
Daily before starting the machine
Procedure
1. Check the fuel lines
(a)
and fittings
(b)
for cracks and leaks.
2. Repair or replace components as needed.
Result
The fuel lines and fittings have now been checked.
5.6
Checking the Shoe Hardware
On new machines, or after replacing shoe, check and tighten shoe hardware
(a)
after the first 5 hours of operation. Inspect hardware every week thereafter.
Torque hardware as specified.
wc_gr009081
a
a
b
86 Nm
(63 ft. lbs.)
wc_gr000068
a
Summary of Contents for DS 70
Page 6: ......
Page 48: ...wc_td000405gb fm 48 Technical Data DS 70 7 6 Dimensions mm in...
Page 50: ......