
SG-2SMT & SG-10SMT ADD-A-SECTION INST. (Continued)
11.
Using a 5/16" socket, remove the side flue deflector
from the top of the unit. (See Detail K)
12.
Remove the two remaining 7/16" bolts from the bottom
of the leg stand. Allow the unit to rest unbolted on the
stand until stacking is required.
2.
While facing the front of the unit disassemble three
5/16" hex head screws from the front right hand body
side cover. Remove body side cover by placing hands
at the top and bottom of cover while lifting upward, and
then pull and straighten out away from oven. (See
Detail M and Detail G)
PART B.
PREPARING THE SMB UNIT FOR STACKING.
TOOLS REQUIRED FOR THIS PROCEDURE:
5/16" hex head socket, 1/4" socket driver and 6" x 1/4"
socket drive extension.
1.
Assemble aluminized flue housing (d) to SMB body top
using (8) 5/16" hex head screws. (See Detail L)
10