Fig. 17
2.
Push kettle assembly support shaft thru shaft
seal and inner bearing.
3.
Square the kettle assembly to control box
housing. Maintain squareness during
adjustments.
Fig. 18
4.
On K6ETT and K12ETT only.
A.
Ensure the pour stop pin on kettle assembly
engages with tilt stop on control box
housing. Approximately 3/16" spacing
should be maintained between the pour
stop pin and control box housing. Adjust
kettle assembly position as necessary.
NOTE:
The kettle assembly may drop slightly after
2x4 blocks are removed and when fully loaded. The
spacing of pour stop pin will prevent it from rubbing
the control box during tilt.
Fig. 19
5.
Insert lead wire bundle thru pivot stop collar.
Position pivot stop collar as shown in the picture
below. Set screws should remain out of collar.
A.
Slide pivot stop collar onto support shaft.
Operate tilt lock then slide collar against
inner bearing. Hold the collar in position and
release tilt lock. Verify pivot stop pin fully
engages with the slot in pivot stop collar for
the tilt lock as shown. Adjust kettle assembly
position as necessary.
NOTE:
The pin location shown will lock the kettle fully
upright. When the kettle is tilted, the pin engages with
the slot near the top to lock the kettle in position.
Fig. 20
6.
Insert lead wire bundle thru the outer bearing.
Slide bearing onto support shaft and position it
against pivot stop collar. Install bolts and tighten
to secure the bearing.
Electric Countertop Tilting Kettles, K6ETT, K12ETT, K20ETT - REMOVAL AND REPLACEMENT OF PARTS
Page 11 of 28
F35496 Rev. A (1117)