![VorTek Pro-T Instruction Manual Download Page 8](http://html1.mh-extra.com/html/vortek/pro-t/pro-t_instruction-manual_1050443008.webp)
Table of Contents
Series M22/M23/M24 Instruction Manual
0-8
M-000-00010
Warnings and Cautions
Warning!
Consult the flow meter nameplate for specific flow meter approvals before any hazardous
location installation.
Hot tapping must be performed by a trained professional. U.S. regulations often require a
hot tap permit. The manufacturer of the hot tap equipment and/or the contractor perform-
ing the hot tap is responsible for providing proof of such a permit.
All flow meter connections, isolation valves and fittings for cold/hot tapping must have the
same or higher pressure rating as the main pipeline.
For Series M23 insertion flow meter installations, an insertion tool must be used for any
installation where a flow meter is inserted under pressure greater than 50 psig.
To avoid serious injury, DO NOT loosen a compression fitting under pressure.
To avoid potential electric shock, follow National Electric Code or your local code when
wiring this unit to a power source. Failure to do so could result in injury or death. All AC
power connections must be in accordance with published CE directives. All wiring proce-
dures must be performed with the power Off.
Before attempting any flow meter repair, verify that the line is not pressurized. Always
remove main power before disassembling any part of the mass flow meter.
Caution!
Calibration must be performed by qualified personnel. VorTek Instruments, Inc., strongly
recommends that you return your flow meter to the factory for calibration.
In order to achieve accurate and repeatable performance, the flow meter must be in-
stalled with the specified minimum length of straight pipe upstream and downstream of
the flow meter’s sensor head.
When using toxic or corrosive gases, purge the line with inert gas for a minimum of four
hours at full gas flow before installing the flow meter.
For Series M23 insertion flow meter installations, the sensor alignment pointer must point
downstream in the direction of flow.
The AC wire insulation temperature rating must meet or exceed 85°C (185°F)
Summary of Contents for Pro-T
Page 10: ...Table of Contents Series M22 M23 M24 Instruction Manual 0 10 M 000 00010...
Page 20: ...Chapter 1 Introduction Series M22 M23 M24 Instruction Manual 1 10 M 000 00010...
Page 60: ...Chapter 2 Installation Series M22 M23 M24 Instruction Manual 2 40 M 000 00010...
Page 126: ...Chapter 5 Troubleshooting Repair Series M22 M23 M24 Instruction Manual 5 16 M 000 00010...
Page 140: ...Appendix B Approvals Series M22 M23 M24 Instruction Manual B 4 M 000 00010...
Page 150: ...Appendix D Glossary Series M22 M23 M24 Instruction Manual D 4 M 000 00010...