Group 30 Electrical System—VNL, VNM
Service Procedures
Installation
1
Install the DRL module into the lower
TEC tray with 2 torx bolts (see illustra-
tion in Removal procedure). Torque to
4.5 ± 0.5 Nm (40 ± 5 in-lb).
2
Connect the electrical connector on
the DRL module.
3
Install the top TEC tray by sliding the
tray’s rear slots back onto the nuts.
Start the bolts in the tray at the front
before tightening. Torque rear nuts to
6 ± 1 Nm (53 ± 1 in-lb). Torque front
bolts to 10 ± 1.5 Nm (89 ± 13 in-lb).
4
W3001007
1) Spacers
Install the fuse panel with 3 torx bolts,
reaching through the ashtray opening
to install the lower bolt. Torque to 4.5
± 0.5 Nm (40 ± 5 in-lb). Align the 2
plastic spacers with the bolts, taking
care to route the wires so that none
are caught between the spacers and
mounting brackets, or between the
spacers and the fuse panel.
5
Install the ashtray housing and ash-
tray. Torque ashtray mounting screws
to 0.4 ± 0.1 Nm (3.5 ± 1 in-lb).
0.4 ± 0.1 Nm
(3.5 ± 1 in-lb)
6
Install the fuse panel cover and the
top TEC panel cover. Torque screws
to 2.5 ± 0.5 Nm (22 ± 5 in-lb).
2.5 ± 0.5 Nm
(22 ± 5 in-lb)
3645-03-02-03
Combi Relay Replacement
Removal
1
Make certain the vehicle ignition is
OFF before beginning this procedure.
2
W8000924
Remove the top cover of the TEC cen-
ter by removing the 2 screws.
3
Remove the fuse panel cover by re-
moving the screws from the cover.
4
Remove the ashtray from the ashtray
housing. Remove the 2 screws from
the ashtray housing, and remove the
housing.
80