NOTE

 The combined feed and vent pipe must rise continu-

ously and be unrestricted.

  The diameter of the combined feed and vent pipe shall 

be 22mm.

  The minimum distance from the top of the boiler to the 

bottom of the F&E tank shall be no less than 1-metre, 
whilst the maximum distance shall be no greater than 
30-metres.

The supply of water to the F&E tank should be taken 
from the mains water supply via a suitable fl oat operated 
valve, whilst the supply from the F&E tank to the boiler/
heating circuit (via the combined feed and vent pipe) 
shall be unrestricted.

3.6.2 AUTOMATIC BY-PASS

Vokera recommend that an automatic bypass is installed 
to ensure the required minimum fl ow-rate is achieved at 
all times.  Additionally, the design of the system and its 
controls should ensure that an adequate temperature 
differential is met, and should be such that it prevents 
boiler ‘cycling’.

3.6.3 DRAIN COCKS

These must be located in accessible positions to facilitate 
draining of the appliance and all water pipes connected 
to the appliance.  The drain cocks must be manufactured 
in accordance with BS 2879.

3.6.4 AIR RELEASE POINTS

These must be positioned at the highest points in the 
system where air is likely to be trapped.  They should 
be used to expel trapped air and allow complete fi lling 
of the system.

3.7 ELECTRICAL SUPPLY

The appliance is supplied for operation on 230V @ 50Hz 
electrical supply; it must be protected with a 3-amp fuse.  
The method of connection to the mains electricity supply 
must allow for complete isolation from the supply.  The 
preferred method is by using a double-pole switch with 
a contact separation of at least 3mm.  The switch must 
only supply the appliance and its corresponding controls, 
i.e. time clock, room thermostat, etc.  Alternatively an un-
switched shuttered socket with a fused 3-pin plug both 
complying with BS 1363 is acceptable.

3.8 MOUNTING ON A COMBUSTIBLE

 

SURFACE

If the appliance is to be fi tted on a wall of combustible 
material, a sheet of fi reproof material must protect the wall.

3.9 TIMBER FRAMED BUILDINGS

If the appliance is to be fi tted in a timber framed building, 
it should be fi tted in accordance with the Institute of Gas 
Engineers publication (IGE/UP/7) ‘Guide for Gas Instal-
lations in Timber Frame Buildings’. 

3.10 INHIBITORS

Vokera recommend that an inhibitor - suitable for use 
with aluminium heat exchangers - is used to protect the 
boiler and system from the effects of corrosion and/or 
electrolytic action.  The inhibitor must be administered 
in strict accordance with the manufacturers instructions*.
*Water treatment of the complete heating system - includ-
ing the boiler - should be carried out in accordance with 
BS 7593 and the Domestic Water Treatment Association’s 
(DWTA) code of practice.

3.11 APPLIANCE PIPEWORK CONFIGURATION 

(fi g.4)

The appliance ‘fl ow’ and ‘return’ connections can be 
confi gured to suit the following:
1.  Top outlet connection
2.  Bottom outlet connection
3.  Top (fl ow), bottom (return) connection
4.  Top (return) bottom (fl ow) connection.

3.11.1 FEED & VENT PIPEWORK

The feed and vent pipe work from the boiler to the F&E 
(Feed & Expansion) tank should be confi gured as shown 
in fi g. 4A using a 22mm combined feed and vent pipe. 

Summary of Contents for MYNUTE 15 VHE

Page 1: ...TO BE RETAINED BY USER Mynute VHE High efficiency open vent boiler Vok ra is a licensed member of the Benchmark scheme which aims to improve the standards of installation and commissioning of domestic...

Page 2: ...5 3 Initial filling of the system 18 5 4 Initial flushing of the system 18 5 5 Pre operation checks 18 5 6 Initial lighting 18 5 7 Checking gas pressure combustion analysis 18 5 8 Final flushing of th...

Page 3: ...voltage directive 2006 95 EC Directive 2009 125 EC Ecodesign for energy using ap pliances Directive 2010 30 EU Indication by labelling of the con sumption of energy by energy related products Delegate...

Page 4: ...e temperature selector clockwise to increase the boiler outlet temperature or counter clockwise to reduce the outlet flow temperature 2 digit LED display Displays the current outlet temperature of the...

Page 5: ...sure flame stability at the burner Once successful ignition has been achieved the electronic circuitry increases the gas rate to 75 for a period of 15 minutes Thereafter the boiler s output will eithe...

Page 6: ...50mm from casing or 25mm above flue elbow whichever is applicable Bottom 150mm Front 600mm 2 5 Connections Flow return 22mm Gas 15mm Condense 21mm 2 6 Electrical Power consumption Watts 35 Supply V Hz...

Page 7: ...ed 15 kW Seasonal space heating energy efficiency s 93 For boiler space heaters and boiler combination heaters useful heat output For boiler space heaters and boiler combination heaters useful efficie...

Page 8: ...3 GAS SUPPLY The gas meter as supplied by the gas supplier must be checked to ensure that it is of adequate size to deal with the maximum rated input of all the appliances that it serves Installation...

Page 9: ...ins electricity supply must allow for complete isolation from the supply The preferred method is by using a double pole switch with a contact separation of at least 3mm The switch must only supply the...

Page 10: ...top of the boiler to the bottom of the F E tank shall be no less than 1 metre whilst the maximum distance shall be no greater than 30 metres The distance between the bottom of the F E tank and the hi...

Page 11: ...ther watervapourwillcondense on leaving the terminal the effect of such pluming must be considered If installed less than 2m above a pavement or platform to which people have access including balconie...

Page 12: ...he combined feed and vent pipe shall be unrestricted 3A 11 2 ALTERNATIVE CLOSE COUPLED ARRANGEMENT If necessary or if preferred a close coupled arrange ment for the feed and expansion pipe work can be...

Page 13: ...if applicable 4 5 FITTING THE FLUE The top flue outlet permits both horizontal and vertical flue applications to be considered alternatively the Vokera twin flue system can be utilised if longer flue...

Page 14: ...d an appropriate type and quantity of fixing should be used to ensure that the bracket is mounted securely Once the bracket has been secured to the wall attach the rear flue terminal to the appliance...

Page 15: ...730mm 208mm Using the dimensions given in fig 12 as a reference mark and cut a 115mm hole in the ceiling and or roof X X 139 mm Fit the appropriate flashing plate to the roof and insert the vertical...

Page 16: ...be given to the fact that there is the possibility of a small amount of condensate dripping from the terminal Ensure that the entire flue system is adequately sup ported use at least one bracket for...

Page 17: ...centric to twin converter The last twin flue pipes must be pushed 50mm onto the male spigots of the concentric to twin converter You must ensure that the entire flue system is properly supported and c...

Page 18: ...iled instructions ANY EXTERNAL CONTROL OR WIRING MUST BE SERVED FROMTHE SAME ISOLATOR AS THAT OF THE APPLIANCE The supply cable from the isolator to the appliance must be 3 core flexible sized 0 75mm...

Page 19: ...fig 21 Pass the pump cable first through the cable anchorage point and then through the cable glands Connect the pump cable wires LIVE NEUTRAL EARTH to their corresponding terminals Live brown Neutral...

Page 20: ...e 7 8 particularly continuity polarity and resistance to earth Ensure the 3 AMP fuse supplied with the appliance has been fitted Ensure the system has been properly filled and vented Ensure the flue s...

Page 21: ...ECURED ENSURE ALL PIPE WORK IS RE CHECKED FOR TIGHTNESS RE FIT APPLIANCE CASING COMPLETE BENCHMARK CHECKLIST FOR UK ONLY Complete details of the boiler controls installation and commissioning in the B...

Page 22: ...pliancedesignspecifica tion Anydeteriorationinperformancemustbeidentified and rectified without delay Check that the burner and main heat exchanger are clean and free from any debris or obstruction Ch...

Page 23: ...e unit Disconnect the electrical plug and leads from the gas valve slacken and unscrew gas valve inlet and outlet connections Please note the sealing washers A must be discarded and replaced with new...

Page 24: ...cations Step 4 fig 29 Locate and remove the 3 nuts B that secure the fan flue assembly to the heat exchanger The fan flue assembly can now be removed with care Step 5 The burner can now be removed wit...

Page 25: ...he appliance ease the control panel from its location Step 2 Disconnect all wiring connections from the flue fan as sembly and heat exchanger Step 3 Slacken the gas pipe A at the outlet connection and...

Page 26: ...epumpwillrunfor15 secondsthenofffor15 seconds and will not fire until this period has elapsed 7 2 3 HEATING MODE With the selector switch in the ON position and any additional controls time clock prog...

Page 27: ...G Locate and gently turn the HTG trimmer till the minimum value fan speed is obtained and check that it corre sponds with the appropriate CO2 value Minimum for the respective appliance If the CO2 read...

Page 28: ...nce terminal strip fig 21 NOTE Should it be found that the fuse has failed but no fault is indicated a detailed continuity check will be required to trace the fault A visual inspection of components m...

Page 29: ...uity If the boiler still fails to respond refer to the detailed faultfinding flowcharts located at the end of this section CODE CAUSE ALARM TYPE ACTION AL10 Ignition failure not flame sensed con dense...

Page 30: ...YPICAL CONTROL APPLICATIONS The appliance can be used with the following controls Single channel voltage free time clocks Programmable room thermostats Externaltwin channelprogrammers Theappliancecan...

Page 31: ...nsformer FS Flow thermistor NTC RS Return thermistor NTC AD02X Main PCB CN1 CN5 Connection to PCB high voltage X4 X9 Connection to PCB low voltage F O H T Flow over heat thermostat H E T Heat exchange...

Page 32: ...30 FUNCTIONAL DIAGRAM 8 4 1 S Plan with Vokera 2 channel programmer 8 4 2 Y Plan with Vokera 2 channel programmer Fig 40 Fig 41 N L E...

Page 33: ...he meter must be purged and checked for gas soundness 10 6 CORRECTING THE CO2 VALUES ADJUSTING THE GAS VALVE THE GAS VALVE MUST BE SET UP OR ADJUSTED WITHTHE AID OF A PROPERLY CALIBRATED FLUE GAS ANAL...

Page 34: ...If different adjust the gas valve according to the above 10 8 APPLIANCE FAN SPEEDS The appliance fan speeds require to be checked and or adjusted prior to making any adjustments to the gas valve or i...

Page 35: ...tabilise YES Is CO less than 350ppm AND CO CO2 ra o less than 0 004 NO Boiler is opera ng sa sfactorily No further ac ons required Ensure test points are capped boiler case is correctly replaced and a...

Page 36: ...FRPPLVVLRQLQJ FKHFNOLVW completed in full 7R LQVWLJDWH WKH ERLOHU JXDUDQWHH WKH ERLOHU QHHGV WR EH UHJLVWHUHG ZLWK WKH PDQXIDFWXUHU ZLWKLQ RQH PRQWK RI WKH LQVWDOODWLRQ 7R PDLQWDLQ WKH ERLOHU JXDUDQW...

Page 37: ...HU LQWHUORFN 3URYLGHG ALL SYSTEMS 7KH V VWHP KDV EHHQ XVKHG DQG FOHDQHG LQ DFFRUGDQFH ZLWK 6 DQG ERLOHU PDQXIDFWXUHU V LQVWUXFWLRQV Yes KDW V VWHP FOHDQHU ZDV XVHG KDW LQKLELWRU ZDV XVHG 4XDQWLW OLWUH...

Page 38: ...SKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDWH 2 SSP AND 2 W PLQ UDWH KHUH 3RVVLEOH 2 SSP AND 2 RPPHQWV 6LJQDWXUH SERVICE 04 DWH QJLQHHU QDPH RPSDQ QDPH 7HOHSKRQH 1R DV VDIH UHJLVWHU 1R 5HFRUG W PD UDW...

Page 39: ...37...

Page 40: ...38...

Page 41: ......

Page 42: ...1HG enquiries vokera co uk www vokera co uk www vokera ie Sales General Enquires T 0844 391 0999 F 0844 391 0998 Vok ra Ireland West Court Callan Co Kilkenny T 056 7755057 F 056 7755060 Vok ra Limited...

Reviews: