
03TA Service Manual
MAINTENANCE
3/31/14
7-8
Preventive Maintenance.
A careful inspection of the Tube-Ice
®
machines refrigeration system for
leaks and correct operational functions at time of installation will start its long satisfactory life of
service. In order to insure this degree of dependability, a systematic maintenance program is
recommended. Therefore, the following schedule is suggested as a minimum.
(A) Daily
1. Check “ice-out” time (maintain 30 second free running after last ice is out).
2. Check clarity of ice produced and hole size.
3. Check compressor oil level.
4. Check refrigerant charge by observing operation level in receiver gage glass (30).
(B) Weekly
1. Check system for leaks with suitable leak detector for the first four weeks of operation.
2. Check oil level and condition.
(C) Monthly (in addition to weekly checks)
1. Check calibration and operation of all controls (high and low pressure switches, oil pressure
switch, etc.)
2. Check cooling tower for scaling and algae (consult water treatment suppliers for corrective
measures).
3. Check water distributors in freezer for scale accumulation.
4. Check water tank for solids to be removed.
5. Check all motor drive units (compressor, cutter and pump motors, cooling tower fan and
pump, etc.) for abnormal noise and/or vibrations.
6. Check oil level in gear reducer.
(D) Yearly (in addition to weekly and monthly)
1. Check entire system for leaks (see “B”).
2. Drain water from condenser and cooling tower and check condenser tubes. Check closely for
damage by corrosion or scale.
3. Remove all rust from all equipment, clean, and paint.
4. Check all motors for shaft wear and end play.
5. Check operation and general condition of all electrical controls, relays, motor starters, and
solenoid valves.
6. Check freezing time, ice release time, and ice out time.
7. Change oil in gear reducer box once a year.
PRESSURE RELIEF VALVES MUST BE REPLACED AFTER 5 YEARS OF SERVICE.
BEFORE REPLACING RELIEF VALVE, REVIEW REQUIREMENTS PER CURRENT
LOCAL AND NATIONAL CODE.
NOTE: IF RELIEF VALVE DISCHARGES, VALVE MUST BE REPLACED BECAUSE SETTING OR SEAT
TIGHTNESS MAY BE ALTERED.
CONTACT VOGT ICE PARTS DEPARTMENT FOR REPLACEMENT VALVES.
PHONE: 502-635-3000
Summary of Contents for TUBE-ICE 03TA
Page 10: ...5 24 11 Blank page ...
Page 14: ...03TA Service Manual INTRODUCTION 4 21 14 1 4 FIGURE 1 1 Assembly Air Cooled Front View ...
Page 15: ...03TA Service Manual INTRODUCTION 4 21 14 1 5 FIGURE 1 2 Assembly Air Cooled Rear View ...
Page 16: ...03TA Service Manual INTRODUCTION 4 21 14 1 6 FIGURE 1 3 Assembly Air Cooled Right Side View ...
Page 17: ...03TA Service Manual INTRODUCTION 4 21 14 1 7 FIGURE 1 4 Assembly Water Cooled Front View ...
Page 18: ...03TA Service Manual INTRODUCTION 4 21 14 1 8 FIGURE 1 5 Assembly Water Cooled Rear View ...
Page 19: ...03TA Service Manual INTRODUCTION 4 21 14 1 9 FIGURE 1 6 Assembly Water Cooled Right Side View ...
Page 20: ...03TA Service Manual INTRODUCTION 4 21 14 1 10 BLANK ...
Page 44: ...5 24 11 Blank page ...
Page 54: ...5 24 11 Blank page ...
Page 104: ...5 24 11 Blank page ...
Page 112: ...5 24 11 Blank page ...