HEC-Series Service Manual
INDEX
10/21/01
13-3
N
NEMA ------------------------------------------------------ 2-1
Nomenclature, Piping Schematic -------------------- 1-9
Non-Condensable Gases ---------------------------- 9-18
Normal Operating Vitals ------------------------------ 11-2
Note To Manager ---------------------------------------- 7-7
Number Structure, HE-------------------------------- 10-1
O
Off Cycle, Wiring Schematic------------------------ 6-13
On/Off Lighted Push Switch (PBL2) ---------------- 6-4
Operation Vitals ---------------------------------------- 11-2
Overload, Cutter------------------------------------------ 6-4
Overload, Pump ------------------------------------------ 6-4
P
Partial Pumpdown Mode ------------------------------- 6-9
Pin, Stainless Steel----------------------------- 9-13, 9-15
Piping and Drain Connections, AC ------------- 3-5,3-7
Piping and Drain Connections, WC ------------ 3-5,3-6
Piping Schematic, Air-cooled -------------------- 4-2,5-4
Piping Schematic, Water cooled ---------------- 4-2,5-5
Piping Schematic, Nomenclature -------------------- 1-9
PLC:
Display ------------------------------------------------- 6-12
Explanation --------------------------------------------- 6-7
Features ------------------------------------------------- 6-5
Flow Chart ---------------------------------------------- 6-6
Inputs & Outputs ------------------------------------ 6-12
Modes-------------------------------------------------- 6-13
Power Connection --------------------------------------- 3-4
Preventive Maintenance -------------------------------- 7-7
Preventive Maintenance Program -------------------- 7-8
Preview----------------------------------------------------- 1-1
Principle of Operation----------------------------------- 4-1
Programmable Controller (PLC) ---------------------- 6-7
Pump, Contactor ----------------------------------------- 6-2
Pumpdown, Partial -------------------------------------- 6-9
Pumpdown, Total -------------------------------------- 9-17
Pump Overload, (4LT) ---------------------------------- 6-4
Pump Overload, Switch (S2) -------------------------- 6-4
Q
R
R-22 (HCFC-22) ----------------------------------------- 4-5
Receipt of Machine -------------------------------------- 2-1
Receiver----------------------------------------------- 1-5,1-8
Refrigerant, Charge ------------------------------------- 5-3
Refrigerant, Leaks ------------------------------------- 9-18
Refrigerant, Removal---------------------------------- 9-17
Refrigerant, System ------------------------------------- 4-5
Registration --------------------------------------- Front Pg.
Reversing Relay ®--------------------------------------- 6-2
Rivet ----------------------------------------------- 9-13, 9-15
S
Safety, Codes--------------------------------------------- 1-4
Safety, Symbols ------------------------------------------ 1-2
Safety, Valves (First Arrival) --------------------------- 2-1
Selector Switch (SS) ------------------------------- 6-4,9-8
Servicing Operations ------------------------------------ 9-1
Shipping Papers ----------------------------------------- 2-1
Single Ice Type ------------------------------------------- 4-4
Single to Dual Ice Conversion----------------------- 9-23
Solenoid Valves ---------------------------------- 5-2, 9-19
Space Diagram (Air-cooled) --------------------------- 3-7
Space Diagram (Water cooled)----------------------- 3-6
Special Precautions ------------------------------------- 1-2
Stand-by Mode ------------------------------------------- 6-8
Start Push Button (PB1) ------------------------------- 6-4
Start-up Checklist---------------------------------------- 5-1
Start-Up Mode -------------------------------------------- 6-7
Start-Up Report ---------------------------------- Front Pg.
Storage ----------------------------------------------------- 2-1
Strainer------------------------------------------------ 1-5,1-7
Sump Area, Water Tank ------------------------------- 7-2
Sunlight ---------------------------------------------------- 2-1
Superheat-------------------------------------------------- 9-2
SVI Switch------------------------------------------ 6-2,6-10
Switch Box Parts----------------------------------------- 6-4
T
Table 3-1 (Water supply & drains) ------------------- 3-5
Table 3-2 (Pounds of Refrigerant) ------------------- 3-9
Table 3-3 (AC condenser data)--------------------- 3-10
Table 3-4 (Equivalent Ft., AC Piping) ------------- 3-11
Table 6-1 (Partial Pumpdown Time)----------------- 6-9
Table 6-2 (Fault Identity) ----------------------------- 6-11
Table 6-3 (Inputs & Outputs)------------------------ 6-12
Table 9-1 (Superheat Settings) ----------------------- 9-2
Table 9-2 (CPR Valve Setting)---------------------- 9-21
Table 11-1 (Capacity of Ice) ------------------------- 11-1
Table 11-2 (Operating Vitals) ----------------------- 11-2
Table 11-3 (Pressure/Temp Chart) ---------------- 11-3
Table 11-4 (Metric Conversion)--------------------- 11-4
Technical Service Bulletin(Water Quality) ------- 13-1
Telephone Number, Vogt ------------------------------ 1-1
Temperature-Pressure Chart------------------------ 11-3
Test Mode ----------------------------------------------- 6-10
Thawing, Chamber -------------------------------------- 4-1
Thawing, Mode ------------------------------------------- 6-8
Thawing, Timer (T) -------------------------------------- 9-8
Thermostat, Adjustments ------------------------------ 9-7
Thermostat, Bin Installation-------------------------- 3-17
Thermostat, Wiring ------------------------------------ 3-18
Timer, Thawing------------------------------------------- 9-8
Total Pumpdown Mode ---------------------------- 5-3,6-9
Trap (AC Piping) --------------------------------------- 3-11
Troubleshooting ------------------------------------------ 8-1
Troubleshooting Mode -------------------------------- 6-10
U
Unusual Air Current ------------------------------ 2-1,3-15
Summary of Contents for HEC-10
Page 1: ...HEC SERVICE MANUAL ...
Page 95: ...HEC Series Service Manual SERVICE OPERATIONS 10 21 01 9 13 FIGURE 9 9 Cutter Water Tank Parts ...
Page 96: ...HEC Series Service Manual SERVICE OPERATIONS 10 21 01 9 14 FIGURE 9 10 Cutter Drive Parts ...
Page 97: ...HEC Series Service Manual SERVICE OPERATIONS 10 21 01 9 15 FIGURE 9 11 Cutter Parts ...
Page 106: ...HEC Series Service Manual MODEL NUMBER STRUCTURE 10 21 01 10 1 10 Model Number Structure ...