HEC-Series Service Manual
TABLE OF CONTENTS
10/23/01
ii
Page No.
Condenser Field Piping, FIGURE 3-7 ................................ ................................ ................................ ......... 3-11
Equivalent Feet of Fittings Due to Friction, TABLE 3-4 ................................ ................................ ............ 3-12
Minimum Traps For Discharge Lines, FIGURE 3-8 ................................ ................................ ................... 3-12
Condenser Piping, FIGURE 3-9 ................................ ................................ ................................ .................. 3-13
Wiring For DD-41 & DD-61, FIGURE 3-10 ................................ ................................ .............................. 3-14
Wiring For DD-101 & DD-131, FIGURE 3-11 ................................ ................................ .......................... 3-14
Air-Cooled Condenser Enclosure, FIGURE 3-12................................ ................................ ........................ 3-15
Field Attachment Air-Cooled Condenser Refrigerant Tubing, FIGURE 3-13................................ ............ 3-16
Ice Bin Thermostat Bulb Installation................................ ................................ ................................ ........... 3-17
Location of Thermostat Bulbs In Ice Storage Bin, FIGURE 3-14................................ ............................... 3-17
Wiring For Single Thermostat Operation, FIGURE 3-15................................ ................................ ............ 3-18
Installation Review: A Checklist ................................ ................................ ................................ ................ 3-19
4. HOW YOUR TUBE-ICE
®
MACHINE WORKS
Principle of Operation ................................ ................................ ................................ ................................ . 4-1
Piping Diagram With Reference Numbers, FIGURE 4-1................................ ................................ ............ 4-2
How Ice Is Stored
Dual Ice ................................ ................................ ................................ ................................ .................... 4-3
Single Ice ................................ ................................ ................................ ................................ .................... 4-4
Ice Bin Capacity ................................ ................................ ................................ ................................ .......... 4-4
Refrigeration System ................................ ................................ ................................ ................................ ... 4-5
5. INITIAL START-UP AND OPERATION
Start-up Checklist ................................ ................................ ................................ ................................ ........ 5-1
Solenoid Valve (Liquid Line), FIGURE 5-1 ................................ ................................ ............................... 5-2
Refrigerant Charge ................................ ................................ ................................ ................................ ...... 5-3
Total Pump Down Mode ................................ ................................ ................................ ............................ 5-3
Piping Schematic Air-Cooled, FIGURE 5-2................................ ................................ ................................ 5-5
Piping Schematic Water Cooled, FIGURE 5-3 ................................ ................................ ........................... 5-6
6. ELECTRICAL CONTROLS & THEIR FUNCTIONS
Control Panel, FIGURE 6-1 ................................ ................................ ................................ ........................ 6-1
Description of Control Panel Parts ................................ ................................ ................................ .............. 6-2
Switch Box, FIGURE 6-2................................ ................................ ................................ ............................ 6-3
Description of Switch Box Parts................................ ................................ ................................ .................. 6-4
Summary of Contents for HEC-10
Page 1: ...HEC SERVICE MANUAL ...
Page 95: ...HEC Series Service Manual SERVICE OPERATIONS 10 21 01 9 13 FIGURE 9 9 Cutter Water Tank Parts ...
Page 96: ...HEC Series Service Manual SERVICE OPERATIONS 10 21 01 9 14 FIGURE 9 10 Cutter Drive Parts ...
Page 97: ...HEC Series Service Manual SERVICE OPERATIONS 10 21 01 9 15 FIGURE 9 11 Cutter Parts ...
Page 106: ...HEC Series Service Manual MODEL NUMBER STRUCTURE 10 21 01 10 1 10 Model Number Structure ...