16
6.6 Connection of Refrigerant Pipe
9) After all the refrigerant installation has been done, use nitrogen to carry out gas leak check.
♦
♦
♦
Caution!
During the connection of the indoor unit or BU module to the refrigerant pipe, never pull any
joints of the indoor unit or the BU module by force; otherwise the capillary pipe or other pipe
may crack, which then would result in leakage.
The refrigerant pipe should be supported by brackets, that is, don't let the unit withstand the
weight of it.
For the Super Free Match system, each pipe should be labeled to tell which system it
belongs to avoid mistaken inaccurate piping.
NO.
①
②
③
④
Name
Coping plate
Rear side plate
Front side plate
Gas side stop
valve
NO.
⑤
⑥
⑦
Name
Liquid side stop
valve
Right connection
board
Front
connection
board
NO.
A
B
C
D
Name
Front connection
Bottom
connection
Side connection
Rear connection
Fig. 16
Summary of Contents for ACP-48COFM140GEEI
Page 1: ...Upute za uporabu User manual ACP 56COFM164GEEI ACP 48COFM140GEEI RoHS 14 ...
Page 2: ...ENG User manual RoHS 14 ACP 56COFM164GEEI ACP 48COFM140GEEI ...
Page 13: ...8 4 2 Outline Dimension of Outdoor Unit Fig 3 mm ...
Page 17: ...12 3 For three BU modules there will not be more than nine indoor units Fig 10 ...
Page 42: ...HR BiH Upute za uporabu RoHS 14 ACP 56COFM164GEEI ACP 48COFM140GEEI ...
Page 53: ...8 4 2 Nacrt dimenzija vanjske jedinice Sl 3 mm ...
Page 57: ...12 3 Za tri BU modula gdje neće biti više od devet unutarnjih jedinica Sl 10 ...
Page 83: ......
Page 87: ......
Page 93: ...3 4 ...
Page 100: ...3 4 3 4 3 4 ...
Page 109: ...www vivax com ...
Page 110: ...www vivax com ...