2
Contents
1
Safety Precautions .............................................................................................................
1
2
Attention for Installation .....................................................................................................
3
2.1
Precautions for R410A ...........................................................................................
3
2.2
Precaution for Installation .......................................................................................
3
2.3
Precaution for Operation Test ................................................................................
3
2.4
Accessories ............................................................................................................
3
3
Product Introduction ...........................................................................................................
4
3.1
Names of Main Parts ..............................................................................................
4
3.2
Combinations for Outdoor and Indoor Units ...........................................................
5
3.3
Parts and Components of Unit ...............................................................................
5
3.4
Working Temperature Range .................................................................................
6
4
Selection of Installation Location and Precautions ............................................................
7
4.1
Selection of Installation Location ............................................................................
7
4.2
Outline Dimension of Outdoor Unit ........................................................................
8
4.3
Installation and Servicing Space ............................................................................
9
5
Installation Instruction ......................................................................................................
10
6
Installation of Refrigerant Pipes .......................................................................................
11
6.1
Manifold Mode of Connecting Pipe
............................................................................. 11
6.2
Allowable Length and Drop Height of Connecting Pipe .......................................
13
6.3
Dimension of Connecting Pipe .............................................................................
14
6.4
Connection of Branch Pipe ...................................................................................
14
6.5
Precaution for Connection ....................................................................................
15
6.6
Connection of Refrigerant Pipe ........................................................................................ 16
6.7
Leak Test
........................................................................................................................ 17
6.8
Vacuum Operation ................................................................................................
18
6.9
Refrigerant Charging
..................................................................................................... 18
7
Electrical Wiring Work ......................................................................................................
22
7.1
Wiring Connection
......................................................................................................... 22
7.2
Requirements of Power Circuit and Cable
............................................................... 22
7.3
Ground Requirements
................................................................................................. 23
7.4
Precautions on the Electrical Wiring Work
............................................................... 23
7.5
Precaution of Laying Wires
.......................................................................................... 24
7.6
Procedures for Electrical Wiring Work
........................................................................ 24
8
Design of Drainage Pipeline ............................................................................................
25
8.1
Installation of Drain Hose
............................................................................................. 25
8.2
Design of Drainage Pipeline .................................................................................
25
9
Installation of Protective Layer on Connection Pipe ........................................................
26
10 Test Operation .................................................................................................................
27
10.1 Check after Installation
................................................................................................ 27
10.2 Test Operation
................................................................................................................ 27
11
Testing Board Introduction
........................................................................................................ 28
11.1
Compose of the Testing Board .............................................................................
28
Summary of Contents for ACP-48COFM140GEEI
Page 1: ...Upute za uporabu User manual ACP 56COFM164GEEI ACP 48COFM140GEEI RoHS 14 ...
Page 2: ...ENG User manual RoHS 14 ACP 56COFM164GEEI ACP 48COFM140GEEI ...
Page 13: ...8 4 2 Outline Dimension of Outdoor Unit Fig 3 mm ...
Page 17: ...12 3 For three BU modules there will not be more than nine indoor units Fig 10 ...
Page 42: ...HR BiH Upute za uporabu RoHS 14 ACP 56COFM164GEEI ACP 48COFM140GEEI ...
Page 53: ...8 4 2 Nacrt dimenzija vanjske jedinice Sl 3 mm ...
Page 57: ...12 3 Za tri BU modula gdje neće biti više od devet unutarnjih jedinica Sl 10 ...
Page 83: ......
Page 87: ......
Page 93: ...3 4 ...
Page 100: ...3 4 3 4 3 4 ...
Page 109: ...www vivax com ...
Page 110: ...www vivax com ...