Initial start−up, inspection and maintenance
8
Implementation
(cont.)
4. Checking the burner
M
aint.
I
nitial start−up
Record all test values in the order of
the commissioning/service report on
the penultimate page of this manual.
Please note:
The flue pipe must be sealed on
the boiler adaptor. Infiltrating air
leads to false readings.
5. Flame monitor check
I
nspection
M
aint.
1.
Pull flame monitor
A
from
flange
B
.
2.
Clean the flame monitor.
Safety check
Response
Burner start with darkened flame monitor
Fault shutdown at the end of
the safety period
Burner start with flame monitor lit from
an outside source
Fault shutdown not later than
after 40 sec.
3.
Push flame monitor
A
into
flange
B
, until strap
C
noticeably clicks into place.
Please note:
Observe the angle and distance.
Safety check
Response
Burner operation with simulated flame
interruption: to do this pull plug
D
from
the solenoid valve during operation and
leave in this condition.
Restart followed by fault
shutdown at the end of the
safety period
E
Sight glass of the flame monitor
F
Strap centering tab
6. System shutdown
I
nspection
M
aint.
1.
Isolate the mains electricity supply
and safeguard against
reconnection.
2.
Pull plug−connector
fA
from the
burner.
3.
Close the oil supply line (oil filter
valve).
5692452 GB
.
.