Initial start−up, inspection and maintenance
10
Implementation
(cont.)
9. Checking the impeller fixings
I
nspection
M
aint.
See maintenance item8.
10. Checking the flame tube fixings
I
nspection
M
aint.
Please note:
The flame tube must be finger
tight.
5692452 GB