Page 1: ...www ecostar com tr MONOBLOCK NG SERIES GAS BURNERS INSTALLATION OPERATING AND MAINTENANCE MANUAL MODULATING OPERATION ECO 50 NG ECO 55 NG ECO 60 NG ECO 65 NG ECO 70 NG...

Page 2: ...and environmental friendly use If you encounter any issue that is not explained clearly in this manual or you could not understand please contact with our service department We thank you for choosing...

Page 3: ...11 INSTALLATION 12 Burner Installation Picture 12 COMMISSIONING 13 Before Commissioning 13 General Controls 13 Combustion Adjustment 14 Gas Adjustment 14 VGD 40 Series Gas Valve 14 Air pressure switch...

Page 4: ...rical voltage Product handling information PF Impulse connection detecting combustion chamber pressure PL Impulse connection detecting combustion air pressure PBR Impulse connection detecting burner g...

Page 5: ...rs concerned with safety elements should be carried out only by the manufacturing company The device should never be used by children mentally handicapped and inexperienced persons Children must not b...

Page 6: ...ck combustion values to be correct by using flue gas analyzer at the whole adjustment range between minimum full load and ignition load Use lifting device or belt for lifting fan motor if necessary Du...

Page 7: ...original packaging until the installation stage Incorrect and poor electrical connections Failures due to incorrect voltage applications frequent repetition of voltage fluctuations Any damage that ma...

Page 8: ...imits of Burners This product works at any load value equivalent to its max capacity or covered by its capacity range In hot water and steam boilers In direct and indirect hot air generators Industria...

Page 9: ...215 000 1 290 000 250 1 500 26 1 156 4 9 6 57 3 2 20 3N 380 ECO 55 G C 3 NG 258 000 1 720 000 300 2 000 31 3 208 5 11 5 76 4 3 00 3N 380 ECO 55 G C 3a NG 258 000 2 150 000 300 2 500 31 3 260 6 11 5 9...

Page 10: ...13 06 2017 Rev 01 9 Back Pressure Capacity Diagrams...

Page 11: ...13 06 2017 Rev 01 10 Burner Dimensions...

Page 12: ...s within the range of 75 decibels max and 85 decibels BURNER HANDLING INFORMATION Lift the product by holding the handles as seen in the picture Prevent strong impacts on top of the product and vibrat...

Page 13: ...nd burner Device must be shipped in original packaging Do not lift the device holding from servomotor gas valve impulse pipes or pressure switch during installation Clean the inside of fuel line thoro...

Page 14: ...ic wiring and making connections Connect the earthing terminal in electric panel to the earthing installation General Controls Make sure to perform the following controls before commissioning the burn...

Page 15: ...will occur Flame control system ionization will start flame control In modulating burner the burner goes into max capacity according to the signal from the modulating control unit When the boiler wate...

Page 16: ...the transparent cover and remove the cover Turn the adjustment wheel in the direction to increase the pressure note the pressure value at which the burner is failed Set the pressure switch to a value...

Page 17: ...r keys You use the left and right keys to move step by step to the selected row At the end of the selected row the cursor jumps to the next row down if possible If the menu has multiple rows you can u...

Page 18: ...13 06 2017 Rev 01 17 Leakage Test for Main Gas Valves...

Page 19: ...or modify unit or equipment connected to it It may damage servomotor or change burner settings Completely isolate equipment from the main supply before performing any wiring changes in servomotor conn...

Page 20: ...cost of additional relays and wiring The BT300 was designed to be attached to the burner The short wiring paths also save money As a result the BT300 is particularly suitable as standard equipment fo...

Page 21: ...lues are accepted as reference according to TS EN 676 A2 standard CO 100 mg kWh 3 O2 5 NOx 170 mg kWh Excess air ratio 1 2 1 3 It is important for the boiler to be sealed in order to avoid incorrect m...

Page 22: ...ometer valve 4 Inlet manometer valve 4 Inlet manometer valve 8 Multi block safety and operation solenoids 5 Regulator 8 Multi block safety and operation solenoids 5 Regulator 9 Sealing Control Set 6 O...

Page 23: ...Check gas line pressure it must be the same with the first adjusted pressure otherwise burner load and emission values will also have changed Check all bolts of the burner Tighten loose bolts After s...

Page 24: ...13 06 2017 Rev 01 23 PERIODICAL FLUE GAS MEASUREMENT REPORT Fuel Consumption m h CO ppm O2 CO2 ppm NOX ppm Yield Flue Temp C Date Signature...

Page 25: ...RK YE Tel 90 216 442 93 00 Fax 90 216 370 45 03 Factory Contact Details T rkg c OSB B lent Ecevit Bulvar No 11 ORLU TEK RDA T RK YE Tel 90 282 685 44 80 81 Fax 90 282 685 42 09 Also you can contact wi...

Page 26: ...13 06 2017 Rev 01 25 NOTES Please record and forward your measurements and observations to us www ecostar com tr...