
30
Checking the ionisation current
A
Adaptor cable (available as acces-
sory)
1.
Connect the test equipment accord-
ing to the diagram.
2.
Set the upper heating output (see
page 18).
3.
Ionisation current when the flame is
first established: Min. 4 µA
If ionisation current < 4 µA: Check the
electrode gap (see page 26).
4.
Switch off the control unit ON/OFF
switch.
Operation with the upper rated heat-
ing output is terminated.
5.
Record the actual value in the
"Reports" table.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5441 514 UAE