
24
Checking the diaphragm expansion vessel and system pressure
Check the diaphragm expansion vessel
pre-charge pressure at test nipple
A
and recharge if required.
Note
Using key
B
supplied, you can refill the
gas combi boiler at the fill valves.
B
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5441 514 UAE