Vitoflex 300-RF Installation & Operating
Precautions must be taken to avoid accidents and injury
during the transportation of the boiler.
Only hoist the boiler when it is entirely empty of water,
fuel and ash.
Lifting
A number of lifting lugs will be provided on each boiler
and heat exchanger where lifting gear may be attached.
A tie bar is required to lift the boiler by the boiler supply
and boiler return flanges.
Minimum clearances to walls for installation and
maintenance work must be observed. Anti-vibration boiler
supports may be used if anti-vibration measures
are required.
Vitoflex 300-RF 150 - 300:
Hoist by the lifting lug.
Vitoflex 300-RF 400 - 540:
Hoist by boiler supply and boiler return flanges using
a lifting lug.
IMPORTANT
WARNING
Follow instructions for proper installation.
For wood-fired installations:
This wood-fired boiler must be installed in accordance
with local codes if any; if not, follow B 365-10,
Installation Code for Solid-Fuel Burning Appliances
and Equipment.
General Information
Transport and Installation
A
Lifting lugs