
54
1.
Check at the siphon that the conden-
sate can drain freely.
2.
Remove retaining clip
A
.
3.
Pull filler pipe
B
upwards.
4.
Remove trap
C
downwards.
5.
Remove the condensate hose from
trap
C
.
6.
Clean the siphon.
7.
Fill siphon with water and reassemble
with retaining clip
A
.
8.
Check that the condensate pipe is
connected correctly to the siphon and
heat exchanger.
Note
Route the drain hose without any
bends and with a constant fall.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5773 216 GB
Summary of Contents for Vitodens 222-F B2TA series
Page 12: ...12 2 5 1 4 2x 3 Installing the boiler Removing the front panels 5773 216 GB...
Page 13: ...13 1 2 SW17 Installing the boiler Siting and levelling the boiler 5773 216 GB Installation...
Page 31: ...31 4 1 5 2 2x 3 Installing the boiler Fitting the front panels 5773 216 GB Installation...
Page 194: ...194 5773 216 GB...
Page 195: ...195 5773 216 GB...