16
Removing the top panel
1.
Fig. 7
Making the hydraulic connections
■
For arrangement of hydraulic connections: See
page 10.
■
Make the hydraulic connections between the two
heat pumps above the heat pumps (on site).
■
All required components (with a suitably designed
plate heat exchanger) for the cooling circuit must be
provided on site.
■
An instantaneous heating water heater (on site) can
only
be installed outside the heat pump. The system
flow temperature sensor must be installed in the flow
direction downstream of the instantaneous heating
water heater.
Installation sequence
Positioning the heat pump
(cont.)
5855006
Installation