15
Required cables and hydraulic lines
G
K
P
C
F
L
O
Q
H
S
D
E
M
N
R
A
B
A
Heat pump
B
Electric terminal area in the heat
pump
C
Power cable, compressor/fan (3/N/
PE 400 V/50 Hz, on site)
D
2 connecting cables inside DN 100
KG conduit (on site), fully wired (5,
15 or 30 m):
■
Control cable
230 V~
■
LV cable
< 42 V
Note
The maximum cable length is
30 m. Extensions are not permis-
sible.
Preparing for installation
Siting requirements
(cont.)
5516 436 GB
Installation