Installation into a lighting duct
Connectors may be installed through a wall or through a window open-
ing. The shortened fill and return connectors are inserted in a 45 º
bend. The bend is inserted into an extension pipe routed through the
wall or the window opening.
D
C
A
E
B
A
Fill connector
B
Pipe clip for earthing
C
Extension pipe
D
Wall outlet Ø 110 mm
or
Outlet Ø 110 mm
E
45º bend
6.18 Fuel storage in on-site pellet store (accessories)
Deflector 1.42 x 1.25 m
Part no. 7388 188
The deflector comprises 4.0 mm thick chipboard with a fabric lining for
high strength.
Install the deflector
B
at a clearance of at least 100 mm from the wall
opposite the fill connector. This deflector protects the pellets as well
as the brickwork or the rendering/plaster.
Pieces of plaster/render or wall that have been prised off can hinder
the pellet supply and the ash removal from the boiler combustion
chamber.
Standard delivery
■ Deflector 1.4 x 1.25 m
■ Section anchor with snap link for fastening
≥200 mm
A
B
C
A
Fill connector
B
Deflector (1000 x 1200 mm)
C
Fill width approx. 4 - 5 m
Blast pipe, straight
Part no. 7388 213
Standard delivery:
■ Blow-in connector with Storz coupling 4”
■ Mounting flange 200 x 200 x 2 mm
■ Zinc-plated steel pipe with male thread M 107 x 2.0
■ Dummy coupling with imprint and padlock
Blast pipe with 45° bend
Part no. 7388 154
Standard delivery:
■ Blow-in connector with Storz coupling 4”
■ Mounting flange 200 x 200 x 2 mm
■ Zinc-plated steel pipe with male thread M 107 x 2.0
■ Dummy coupling with imprint and padlock
Design information
(cont.)
PYROTEC
71
5822 511 GB