65
Observe engineering information.
Heat pump technical guide
Checking the electrical connections for firm seating
Commissioning the system
Commissioning is carried out in 3 stages:
1. Configuring the system
2. Configuring the operating mode
3. Adjusting operating parameters
The parameters and system controller configuration
must be matched individually as required (see follow-
ing chapters and service instructions "Heat pump con-
trol unit Vitotronic SPS, type 2.0").
Note
The type and extent of parameters depend on the heat
pump type and the system configuration.
Observe the instructions in the separate service
instructions of the Vitotronic SPS type 2.0 heat pump
control unit, otherwise the appliance warranty will be
void.
Note
Commissioning must only be carried out by trained
and authorised contractors.
Configuration procedure
"Vitotronic SPS, type 2.0" service instructions
Checking the electronic flow switch, type IFM
12
Fig. 40
The flow switch monitors the minimum flow rate
required for operating the heat pump.
1.
Check the tip of the sensor regularly for deposits.
2.
Clean the tip of the sensor with a cloth if neces-
sary.
Remove stubborn deposits (such as limescale)
with commercially available vinegar-based clean-
ers.
3.
Switch on the power supply.
LEDs "0" to "9" illuminate green in sequence and
then extinguish again.
The operating display then follows.
Commissioning, inspection, maintenance
Checking expansion vessels and primary circuit/secondary circuit pressure
5837251