61
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
•
1. Opening the heat pump
..................................................................................................... 62
•
2. Compiling reports
.............................................................................................................. 62
•
•
•
3. Checking the refrigerant circuit for leaks
........................................................................ 62
•
4. Filling and venting on the primary side
........................................................................... 62
•
5. Fill and vent hydraulic module defrost box (if available)
............................................... 63
•
6. Filling and venting on the secondary side
....................................................................... 64
•
•
•
7. Checking expansion vessels and primary circuit/secondary circuit pressure
............ 65
•
•
•
8. Checking the electrical connections for firm seating
•
9. Commissioning the system
............................................................................................... 65
•
•
•
10. Checking the electronic flow switch, type IFM
................................................................ 65
•
•
•
11. Fitting the top panel and front panel (closing the heat pump)
...................................... 66
•
12. Instructing the system user
.............................................................................................. 66
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5837251