![Victaulic VicFlex AB12 Field Installation Handbook Download Page 130](http://html1.mh-extra.com/html/victaulic/vicflex-ab12/vicflex-ab12_field-installation-handbook_1013532130.webp)
I-VICFLEX_130
CONNECTION TO THE SPRINKLER PIPING REV_A
CONNECTION TO THE SPRINKLER PIPING USING
AN ADAPTER NIPPLE AND A SERIES AH1,
AH1-LP, AH2, AH2-LP, AH2-300, AH3,
AH3-LP, AH4, AH4-LP, AH5, OR AH2-638
VICTAULIC
®
VICFLEX
™
FLEXIBLE HOSE
WARNING
• The flexible hose shall not be bent or fluctuated up-and-down or side-to-side
when pressurized.
Failure to follow this instruction could cause improper sprinkler operation, resulting
in death or serious personal injury and property damage.
1.
Apply pipe joint compound or PTFE thread
sealant tape to the tapered threads of the
adapter nipple, in accordance with the pipe joint
compound or tape manufacturer’s instructions.
Using a pipe wrench, tighten the adapter nipple
into the sprinkler piping.
2.
Confirm that the seal inside the nut of the
flexible hose is in place and is free from damage
prior to installation. Connect the nut to the adapter
nipple, as shown to the left.
•
DO NOT use pipe joint compound or PTFE
thread sealant tape on the threads of the
adapter nipple. The seal inside the nut of
the flexible hose provides the leak-proof
connection.
•
Tighten the connection nut to a torque of
40 ft-lbs/54 N•m (approximately 1/2 to 3/4 of
a turn past hand-tight).
NOTE:
To prevent
damage to the seal, tighten the assembly by
applying torque only to the connection nut
and DO NOT exceed the specified torque.
Summary of Contents for VicFlex AB12
Page 2: ......
Page 10: ...I VICFLEX_10 This page intentionally left blank...
Page 11: ...I VICFLEX_11 General Information...
Page 16: ...I VICFLEX_16 This page intentionally left blank...
Page 17: ...I VICFLEX_17 Construction Requirements...
Page 20: ...I VICFLEX_20 This page intentionally left blank...
Page 21: ...I VICFLEX_21 Styles AB1 AB2 and AB10 Brackets Installation Instructions...
Page 34: ...I VICFLEX_34 This page intentionally left blank...
Page 35: ...I VICFLEX_35 Style AB3 Bracket Installation Instructions...
Page 39: ...I VICFLEX_39 Style AB4 Bracket Installation Instructions...
Page 43: ...I VICFLEX_43 Style AB5 Bracket Installation Instructions...
Page 50: ...I VICFLEX_50 This page intentionally left blank...
Page 51: ...I VICFLEX_51 Style AB6 Bracket Installation Instructions...
Page 61: ...I VICFLEX_61 Style AB7 Bracket Installation Instructions...
Page 68: ...I VICFLEX_68 This page intentionally left blank...
Page 69: ...I VICFLEX_69 Style AB11 Bracket Installation Instructions...
Page 73: ...I VICFLEX_73 Style AB12 Bracket Installation Instructions...
Page 79: ...I VICFLEX_79 ABBA ABMM Bracket Installation Instructions...
Page 86: ...I VICFLEX_86 This page intentionally left blank...
Page 87: ...I VICFLEX_87 Style AQC U Bracket Installation Instructions...
Page 92: ...I VICFLEX_92 This page intentionally left blank...
Page 93: ...I VICFLEX_93 Style C AQC Bracket Installation Instructions...
Page 96: ...I VICFLEX_96 This page intentionally left blank...
Page 97: ...I VICFLEX_97 Style AQD M Bracket Installation Instructions...
Page 104: ...I VICFLEX_104 This page intentionally left blank...
Page 105: ...I VICFLEX_105 Style AQD Bracket Installation Instructions...
Page 113: ...I VICFLEX_113 VS1 Dry Sprinkler Installation Instructions...
Page 128: ...I VICFLEX_128 This page intentionally left blank...
Page 129: ...I VICFLEX_129 Connection to the Sprinkler Piping...
Page 139: ...I VICFLEX_139 Connecting the Sprinkler Reducing Nipple to the Flexible Hose...
Page 141: ...I VICFLEX_141 Sprinkler Reducing Nipple Installation...
Page 148: ...I VICFLEX_148 This page intentionally left blank...
Page 149: ...I VICFLEX_149 Sprinkler Installation...
Page 151: ...I VICFLEX_151 Victaulic VicFlex Tamper Evident Labels Application Instructions...
Page 154: ...I VICFLEX_154 This page intentionally left blank...
Page 155: ...I VICFLEX_155 Minimum Bend Radius Guides...
Page 202: ......
Page 203: ......