I-VICFLEX_110
STYLE AQD BRACKET INSTALLATION FOR
ROUND OR SQUARE METAL OR FRP DUCTS
REV_A
5.
Stabilize the mounting block in
position. Using duct tape, secure the
mounting block to the duct by adhering
the tape to one side of the duct, wrapping
it over the mounting block, and adhering
it to the opposite side of the duct. The
assembly shall not be disturbed for a
minimum of 24 hours to ensure that the
adhesive has hardened.
5a.
After a minimum of 24 hours, remove
the duct tape from the mounting block/
duct assembly. Allow the assembly to
cure for a minimum of 24 hours before
placing any stress on the joint.
NOTE:
Due to temperature, humidity,
etc. curing times may vary. Consult the
adhesive manufacturer’s instructions
for detailed curing times and additional
technical information.
6.
Install the sprinkler by following the
manufacturer’s installation instructions.
For Victaulic
®
sprinklers, refer to the I-40
Victaulic
®
FireLock
™
Automatic Sprinklers
Installation and Maintenance Instructions.
7.
If the protective polyethylene sleeve
assembly is required for corrosive
applications, install the sleeve assembly
by inserting it into the hole in the
mounting block and duct. Ensure the
sleeve is inserted completely into the hole
in the duct to prevent the sleeve from
being damaged during installation of the
union.
Summary of Contents for VicFlex AB12
Page 2: ......
Page 10: ...I VICFLEX_10 This page intentionally left blank...
Page 11: ...I VICFLEX_11 General Information...
Page 16: ...I VICFLEX_16 This page intentionally left blank...
Page 17: ...I VICFLEX_17 Construction Requirements...
Page 20: ...I VICFLEX_20 This page intentionally left blank...
Page 21: ...I VICFLEX_21 Styles AB1 AB2 and AB10 Brackets Installation Instructions...
Page 34: ...I VICFLEX_34 This page intentionally left blank...
Page 35: ...I VICFLEX_35 Style AB3 Bracket Installation Instructions...
Page 39: ...I VICFLEX_39 Style AB4 Bracket Installation Instructions...
Page 43: ...I VICFLEX_43 Style AB5 Bracket Installation Instructions...
Page 50: ...I VICFLEX_50 This page intentionally left blank...
Page 51: ...I VICFLEX_51 Style AB6 Bracket Installation Instructions...
Page 61: ...I VICFLEX_61 Style AB7 Bracket Installation Instructions...
Page 68: ...I VICFLEX_68 This page intentionally left blank...
Page 69: ...I VICFLEX_69 Style AB11 Bracket Installation Instructions...
Page 73: ...I VICFLEX_73 Style AB12 Bracket Installation Instructions...
Page 79: ...I VICFLEX_79 ABBA ABMM Bracket Installation Instructions...
Page 86: ...I VICFLEX_86 This page intentionally left blank...
Page 87: ...I VICFLEX_87 Style AQC U Bracket Installation Instructions...
Page 92: ...I VICFLEX_92 This page intentionally left blank...
Page 93: ...I VICFLEX_93 Style C AQC Bracket Installation Instructions...
Page 96: ...I VICFLEX_96 This page intentionally left blank...
Page 97: ...I VICFLEX_97 Style AQD M Bracket Installation Instructions...
Page 104: ...I VICFLEX_104 This page intentionally left blank...
Page 105: ...I VICFLEX_105 Style AQD Bracket Installation Instructions...
Page 113: ...I VICFLEX_113 VS1 Dry Sprinkler Installation Instructions...
Page 128: ...I VICFLEX_128 This page intentionally left blank...
Page 129: ...I VICFLEX_129 Connection to the Sprinkler Piping...
Page 139: ...I VICFLEX_139 Connecting the Sprinkler Reducing Nipple to the Flexible Hose...
Page 141: ...I VICFLEX_141 Sprinkler Reducing Nipple Installation...
Page 148: ...I VICFLEX_148 This page intentionally left blank...
Page 149: ...I VICFLEX_149 Sprinkler Installation...
Page 151: ...I VICFLEX_151 Victaulic VicFlex Tamper Evident Labels Application Instructions...
Page 154: ...I VICFLEX_154 This page intentionally left blank...
Page 155: ...I VICFLEX_155 Minimum Bend Radius Guides...
Page 202: ......
Page 203: ......