24
VE414
1.
Carefully slide desired size upper roll onto
upper shaft as shown with markings facing for-
ward.
2.
Install upper roll retaining plate and bolt.
Align tab on plate with recess in the slide as
shown. Securely tighten bolt with a wrench.
3.
Lubricate upper roll bearing with a No. 2EP
Lithium base grease as shown. Refer to main-
tenance section for additional information.
4.
Roll installation is complete.
COPPER ROLL INSTALLATION
Removal and installation of 2 - 6" roll set for
copper tubing is identical to removal and
installation of standard roll set for 2 - 3
¹⁄₂
" steel
pipe. See pages 22 - 23.
Removal and installation of 8" roll set for copper
tubing is identical to removal and installation
of standard roll sets for 4 - 16" steel pipe. See
pages 20 - 23.
MAINTENANCE
GENERAL
This manual provides information to permit the
operator of Series 414 tools to keep his equip-
ment in top operating condition and to guide
him in making repairs when it becomes neces-
sary.
Replacement parts, applicable only to these
tools, should be ordered from Victaulic to
ensure proper operation of the tool. All parts
are FOB Easton, Pennsylvania, at the price in
effect at the time of ordering.
After every eight hours of operation lubricate
the tool. Always lubricate upper roll bearings
when rolls are changed.
1.
Grease slide gibs. Two grease fittings are
provided as shown.
NOTICE
Remember that preventative maintenance during
operation will pay for itself in repair and operating
savings.
• Before performing any repair or
maintenance, disconnect the tool
from the electrical source to
prevent accidental start up of
tool, unless otherwise instructed
in this manual.
Failure to do so could result in death
or serious personal injury.