Troubleshooting
6-5
System Pressure Leak Test
1. Set up system as shown in Figure 6-1.
2. Open the O
2
supply valve and provide 50 psi O
2
to the anesthesia system.
3. Turn ON (
l
) the system main ON/OFF switch and allow the system to complete its self-test. The
system should complete the self test without errors. If errors are detected, consult the alarm matrix
in Table 6-2.
4. Attach a rebreathing circuit to the system.
5. Attach a breathing bag to the bag mount located below the pop-off valve.
6. Close the pop-off valve.
7. Plug the wye piece or elbow connector of the F-circuit using your thumb.
8. Continue to plug the end of the breathing wye or elbow while pressurizing the absorber system to
30 cmH
2
O using the O
2
flush valve. The system pressure should not drop more than 5 increments
(30 cmH
2
O to 25 cmH
2
O) in 30 seconds. If a leak is present, use a soapy water solution to help find
its exact location. Repair or replace the leaking component.
WARNING!
Leaks in the system allow room air to dilute the fresh gas mixture causing the
patient to be “light.”
9. Open the pop-off valve and relieve the system pressure down to 10 cmH
2
O as indicated on the
touch screen.
10. Select O
2
flow indicator on the touch screen. Using the touch screen
ST
buttons, set a flow of
250 ml/min.
11. Verify that the pressure gauge on the display slowly starts to climb past 20 cmH
2
O.
12. Open the pop-off valve to relieve pressure.
Figure 6-1 Pressure Test Setup
Pressure Test
Squeeze Bulb
Short Circuit
Tube
Pop-off Valve
Summary of Contents for EX3000
Page 1: ...P N 410 125 EX3000 Veterinary Anesthesia System Operator s Manual ...
Page 8: ......
Page 20: ......
Page 42: ......
Page 56: ......
Page 60: ......
Page 67: ...Replacement Parts and Accessories 10 3 Figure 10 1 EX3000 Anesthesia System ...
Page 69: ...Replacement Parts and Accessories 10 5 Figure 10 3 Optional Keyfill Vaporizer Fillers ...
Page 70: ...10 6 Replacement Parts and Accessories Figure 10 4 410 105A Isoflurane Chamber Assembly ...
Page 71: ...Replacement Parts and Accessories 10 7 Figure 10 5 410 106A Sevoflurane Chamber Assembly ...
Page 72: ...10 8 Replacement Parts and Accessories Figure 10 6 410 102A Sub Chassis Assembly ...
Page 73: ...Replacement Parts and Accessories 10 9 Figure 10 7 410 108A Circuit Board Assembly ...
Page 74: ...10 10 Replacement Parts and Accessories Figure 10 8 410 100A Back Cover Assembly ...
Page 75: ...Replacement Parts and Accessories 10 11 Figure 10 9 410 101A DISS Inlet Assembly ...
Page 76: ...10 12 Replacement Parts and Accessories Figure 10 10 500 100A Pole Assembly ...
Page 77: ...Replacement Parts and Accessories 10 13 Figure 10 11 510 570A APL Pop off Valve Assembly ...
Page 78: ...10 14 Replacement Parts and Accessories Figure 10 12 510 103A Manifold Block Assembly ...
Page 79: ...Replacement Parts and Accessories 10 15 Figure 10 13 510 101A Absorber Canister Assembly ...
Page 80: ...10 16 Replacement Parts and Accessories Figure 10 14 510 129A Flush Valve Assembly ...
Page 82: ......
Page 84: ...A 2 Appendix A Figure A 2 EX3000 Pneumatic Block Diagram EX3000 Pneumatic Block Diagram ...
Page 85: ...Appendix A A 3 Figure A 3 EX3000 Electrical Block Diagram EX3000 Electrical Block Diagram ...
Page 86: ...A 4 Appendix A Figure A 4 EX3000 Electrical Connections EX3000 Electrical Connections ...
Page 87: ......