![Vertiv APM 0250kMK16FN02000 User Manual Download Page 135](http://html1.mh-extra.com/html/vertiv/apm-0250kmk16fn02000/apm-0250kmk16fn02000_user-manual_1008197135.webp)
7.8 Design of Battery Room
No matter which type of installation system is adopted, the following items shall be paid special attention to (refer to Figure
7.2 below).
F igu re 7.2 Design o f battery ro o m
N o.
D es crip tion
1
Layout of cells
No matter which battery installation system is used, the battery shall be located in a matter that it will not contact two naked live parts with
the potential difference over 150 V at the same time. If it is unavoidable, insulated terminal shield and insulated cable shall be used for the
connection.
2
Workbench
The workbench (or pedal) must be skid-proof and insulated, and at least 1 m wide.
3
Wiring
All the wiring distances shall be minimized.
4
BCB
The BCB is generally installed in the wall-mounted box near the battery.
7.9 BCB Cabinet (Optional)
The BCB cabinet can also electrically isolate the UPS from the battery to minimize the danger of the service personnel at
work.
The BCB provides the following functions:
•
Short circuit protection and EOD protection. The BCB opens automatically when the battery voltage drops to
the EOD voltage point
•
Support the UPS EPO function. The BCB opens automatically when the EPO switch on the touch screen of the
UPS is pressed
7 Battery
127
Vertiv™ Liebert® APM Plus User Manual
Summary of Contents for APM 0250kMK16FN02000
Page 1: ...Vertiv Liebert APM Plus User Manual 50 250 kVA UPS...
Page 8: ...vi This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Page 30: ...2 Overview 22 This page intentionally left blank Vertiv Liebert APM Plus User Manual...
Page 97: ...5 Operator Control and Display Panel 89 Vertiv Liebert APM Plus User Manual...
Page 188: ...12 Specifications 180 This page intentionally left blank Vertiv Liebert APM Plus User Manual...