![Vertical Express ICON 32 Product Manual Download Page 9](http://html1.mh-extra.com/html/vertical-express/icon-32/icon-32_product-manual_1007745009.webp)
INSTALLATION
Vertical Express Product Manual
1-5
88600 v.1.0
Installation Section
Preliminary Installation
Installation
(continued)
Configure the UPS
1. When on temporary operation, connect the following:
a. The AC receptacle cord from the IOF Card - CON18, pins 1, 2, and 3.
b. The AC plug from the IOF Card - CON18, pins 4, 5, and 6.
•
The UPS should not be in the AC circuit during temporary operation. See
•
If battery lowering is not required for the job, no UPS will be provided.
•
When battery lowering is not present, Manufacturing installs jumper wires
from CON18 pin 1 to pin 4, pin 2 to pin 5, and pin 3 to pin 6 on the IOF Card.
•
The UPS may be mounted below the controller - Use the shipping bracket
and screws to hold the UPS in place, and wire the plug through a knock
out in the bottom of the controller.
Figure 3 - UPS Unit Connections
2. Use a temporary jumper to connect EPD1 and EPD2 (located in the Trades
Access Panel, on the top of the controller). See Figure 4.
The EPD1 and EPD2 jumper will be replaced by an auxiliary set of contacts in the dis-
connect to prevent the control system from operating on any form of alternate power
when the disconnect is in the OFF position.
Figure 4 - EPD1/EPD2 Jumpers
EPD1 & EPD2
Jumpers
Summary of Contents for ICON 32
Page 1: ...Controller...
Page 3: ...INSTALLATION SECTION...
Page 4: ...INSTALLATION SECTION...
Page 39: ...ADJUSTMENT SECTION...
Page 40: ...ADJUSTMENT SECTION...
Page 83: ...DIAGNOSTICS SECTION...
Page 84: ...DIAGNOSTICS SECTION...
Page 131: ...TROUBLESHOOTING SECTION...
Page 132: ...TROUBLESHOOTING SECTION...
Page 165: ...SERVICE INFORMATION SECTION...
Page 166: ...SERVICE INFORMATION SECTION...
Page 205: ...REFERENCE SECTION SERVICE REFERENCE SECTION...
Page 206: ...REFERENCE SECTION...