Z204998-0M
PAGE 5
©2012 Veris Industries USA 800.354.8556 or +1.503.598.4564 / [email protected]
07121
Alta Labs, Enercept, Enspector, Hawkeye, Trustat, Veris, and the Veris ‘V’ logo are trademarks or registered trademarks of Veris Industries, L.L.C. in the USA and/or other countries.
TM
e30
INSTALLATIoN GUIDe
3. Verify that the serial numbers printed on the current strip and on the data
acquisition board match.
The board and the strip are sold as a calibrated set.
4. Configure communication and addressing parameters using DIP switches. The
E30 requires two addresses, one for each set of two current sensor strips and four
auxiliary inputs. See the Configuration section on page 7 for more information.
5. Install the E30 acquisition board mounting bracket in the panel using screws and
bolts provided (Figure 3). A grounding connection is located on the mounting
bracket, near the lower right corner. Use this stud to ground the bracket when it is
mounted on a plastic surface.
6. Connect current sensor ribbon cables to the 50-pin connectors on the main board
(Figures 4 and 5).
Orient cables so that the red stripe is on the left.
E30 CURRENT SENSOR STRIP
E30 CURRENT SENSOR STRIP
E30 CURRENT SENSOR STRIP
E30 CURRENT SENSOR STRIP
Panel 1
Panel 2
Figure 3
Figure 4
Figure 5
2-Strip Version
4-Strip Version
Panel 1 uses base Modbus address as set by DIP switches.
Panel 2 uses base + 1 Modbus address as set by DIP switches.
Align ribbon cable key with
connector keyhole.
Orient ribbon cable so that the
red stripe is on the left side of
the connector.
Panel 2
Panel 1
A
A
B
B
L1 L2 L3 N
Panel 1
A
B
Panel 2 Mains
Panel 1 Mains
Red Stripe