Nextiva S2800e Series User Guide
Verint Video Intelligence Solutions
15
4. Unlatch the interface board and swing it 90º downward, providing access to the
terminal blocks. To completely remove the board, snap it out of the hinge after its
rotation to the 90º downward position.
5. If you are not using a flexible conduit pipe:
a. Remove the conduit fitting by loosening the nut and sliding it out.
b. Install the supplied strain relief fitting in its place.
c. Hold the enclosure near the ceiling hole and route cables through the strain relief
fitting.
6. If cables are channeled through a flexible conduit pipe:
a. Hold the enclosure near the ceiling hole and route the cables through the conduit
fitting.
b. Insert the end of the flexible conduit pipe into the conduit fitting. Cable length
should be flush with the bottom of the enclosure, approximately 9 inches
(229 mm).
c. Tighten the clamp screw.
7. Lift the enclosure up through the ceiling hole, turn it, then tighten the flipper screws.
8. Connect the wires to the interface board. For the procedure, see page 24.
To install the in-ceiling camera:
1. If you are not using a flexible conduit pipe:
a. Loosen the flipper screws and remove the enclosure from the ceiling.
b. Slide the cables back through the fitting until the terminal blocks are flush with the
bottom of enclosure, approximately 9 inches (229 mm).
c. Tighten the conduit fitting and reinstall the enclosure into the ceiling by tightening
the flippers.
Note: Ensure to leave minimal wire slack at all connection points.
Latch
Hinge
Interface board
Conduit fitting
Nextiva S2800e Series User Guide.book Page 15 Wednesday, March 11, 2009 3:20 PM
Summary of Contents for NEXTIVA S2800E series
Page 1: ...Nextiva S2800e Series User Guide Firmware Release 4 80 April 2009...
Page 54: ...Verint Video Intelligence Solutions 46 Factory Default Configuration...
Page 58: ...Verint Video Intelligence Solutions 50 Technical Specifications...
Page 69: ...Verint Video Intelligence Solutions 61 Compliance...