3.0 Installation
3.4
Fitting the Chimney
l
Remove the chimney panel, (see Fig 10.)
l
Fasten the chimney to the top of the product using the screws provided, (see Fig 12.)
l
Replace the chimney panel, (see Fig 11.)
Fig 10 - Remove the
chimney panel
Fig 11 - Replace the
chimney panel
Fig 12 - Chimney
screws
3.5
Ducting
The chimney must either be placed under a powered exhaust hood, or connected
directly to a 76 mm duct (not supplied) to the outside of the building; any such duct
must NOT have powered extraction.
The fumes should be ducted by either of the above methods to at least 1 metre above
the level of the building.
Rules for ducting:
l
Ducting diameter must be 76 mm or more.
l
Ducting must be 76 mm where it connects to the chimney.
l
Ducting length must not exceed 3 metre for 76 mm diameter; for longer lengths con-
sult a ducting engineer.
l
Flexible ducting, if used, must be suitable for exhaust gas extraction.
l
If an extraction fan is fitted an extraction hood is required with free flow of air
around the chimney.
l
Do not connect more than one product to a single duct. (Exception: where a fanned
duct with hoods is used)
16
Summary of Contents for CARBOLITE GERO ABA 7/35B
Page 11: ...2 2 Identifying the Parts 11 2 0 Supplied Item List ...
Page 19: ...Fig 14 Schematic for Mains Electrical Connections 19 3 0 Installation ...
Page 57: ...Fig 61 Screen view Standard Recipe Fig 62 Calibration Recipe 57 14 0 Recipe Editor ...
Page 70: ...20 0 Temperature Calibration Fig 72 Screen view Dual Point Calibration 70 ...
Page 93: ...Notes Service Record Engineer Name Date Record of Work ...