
3.0 Installation
3.0
Installation
3.1
Unpacking and Handling
When unpacking or moving the product, always lift by its base; do not use the door or
any other projecting cover or component to support the equipment when moving it. Use
a fork lift or pallet truck to move the product; position the product on a level surface and
use an adequate number of personnel to safely move the product into position.
Carefully remove any packing material from inside and around the product before use.
Avoid damaging the surrounding insulation when removing packing materials.
This product is fitted with a safety door lock; when there is no power
connected to the equipment the door has to be opened using the key supplied.
The keyhole is located on the right hand side of the case.
Lock the door again after checking and clearing the interior. See section 4.2.
NOTE: This product contains Refractory Ceramic Fibre (also known as
Alumino Silicate Wool - ASW). For precautions and advice on handling
this material see section 22.2.
3.2
Siting and Setting Up
Place the product on a level surface in a well ventilated area.
Site away from other sources of heat and on a non-flammable surface that is resistant
to accidental spillage or hot materials.
The surface on which the equipment is mounted should be stable and not subject to
movement or vibrations.
The height of the mounting surface is important to avoid operator strain when loading
and unloading samples.
Unless otherwise stated elsewhere in this manual, ensure that there is
at least 150
mm
of free space around the back and sides of the product. Clear space is required
above the product to dissipate heat.
14
Summary of Contents for CARBOLITE GERO ABA 7/35B
Page 11: ...2 2 Identifying the Parts 11 2 0 Supplied Item List ...
Page 19: ...Fig 14 Schematic for Mains Electrical Connections 19 3 0 Installation ...
Page 57: ...Fig 61 Screen view Standard Recipe Fig 62 Calibration Recipe 57 14 0 Recipe Editor ...
Page 70: ...20 0 Temperature Calibration Fig 72 Screen view Dual Point Calibration 70 ...
Page 93: ...Notes Service Record Engineer Name Date Record of Work ...