FP15 & FP15A Waterloo - Installation and Operation Manual
73
APPENDIX 6 - INSTALLATION OF SECONDARY AIR TUBES AND BAFFLE
REMOVABLE PARTS
A
Cotter pins
(x4)
B
Air tubes
(x4)
C
C-cast baffle
(x1)
1.
Remove the inner ash retainer and the floor refractory
slab
(A & B)
.
2.
Using a power screwdriver and hex tip
5/16", remove the slab holder
(D)
and the
left refractory slab
(C)
.
Summary of Contents for Waterloo FP15
Page 10: ...10 FP15 FP15A Waterloo Installation and Operation Manual 2 3 Measurements FP15 ...
Page 11: ...FP15 FP15A Waterloo Installation and Operation Manual 11 ...
Page 12: ...12 FP15 FP15A Waterloo Installation and Operation Manual 2 4 Measurements FP15A ...
Page 13: ...FP15 FP15A Waterloo Installation and Operation Manual 13 ...
Page 77: ...FP15 FP15A Waterloo Installation and Operation Manual 77 ...
Page 87: ...NOTES ...
Page 88: ...88 FP15 FP15A Waterloo Installation and Operation Manual ...
Page 89: ......