Vega MT X CAN / User Manual
15
Revision 13 of 27.09.2021
Step by step mounting is as follows:
1.
De-energizing the connected equipment and the vehicle's on-board power.
2.
Connection of external power wires according to the scheme through a fuse.
3.
Power ON.
4.
Connection of an external equipment, sensors, and configuration of them (see part “
”).
5.
Device configuration, CAN bus operation if it is needed.
6.
By the laptop you can make sure that the device is successfully configurated and sends the
correct data.
7.
Mounting of the device with zip ties.
8.
Placement of external antennas if necessary.
General recommendations for the placement of antennas boil down to two rules: avoid covering the
GSM antenna with metal parts of the vehicle and, if possible, provide a line of sight to satellites (i.e.,
open skies) for the GNSS antenna.