11
1. Installing base and tall cabinets
Assemble the cabinets on their sides. Use clamps and screw the cabinets together with connection screws (TFX 4x28). When connecting
cabinets, DO NOT SCREW into the pilot holes. The screws in the image are hidden by the standard hinge when the door is fitted. In the case
of hinges with damping, the connection screw is not located in the same place, rather it is moved down and inwards into the frame, where
it becomes visible. Screw the cabinets into the wall through the mounting bars at the back edge. Use screws that are suitable for the wall
material; these are not included in the delivery. With veneered cabinets and shelves for wine/cookbooks, screw from inside adjacent cabinets.
When installing with screws from inside the frame, the screw heads can be covered with cover plugs, white 20 mm, with art. no. 39226.
1.4 FULLY INTEGRATED DISHWASHER
1.5 PUTTING TOGETHER BASE CABINETS
For a fully integrated dishwasher, fit the
partition strip art. no. 47148 (600 mm) and
47149 (450 mm), see image to the right,
between the base cabinets using angle
braces and screws.
Under the counter top, the guard provided
by the dishwasher supplier must be fitted as
per the instructions. Vedum has an aluminium
tape as an accessory for attaching to the
underside of the counter top – at the front –
above the dishwasher to protect the counter
top from intense heat and hot steam.
We recommend that you install our
splashback art. no. 30533 on the sides of
the base cabinets on either side of the
dishwasher. These are supplied as two-packs
with double-sided tape on the back for easy
installation. See the product’s enclosed
installation guide.
Mounting plate for standard hinges
Mounting plate for dampened hinges