4. Installation Procedures
36
Green21 (Model: PCT-90LH) Installation Manual
4.5
Leveling the Equipment
1. Place the spirit level for leveling the front/rear on top of the Rotating Unit as
shown below.
Figure 4-21. Leveling the front/rear
2. Adjust the level foot on the Base Unit until the bubble in the middle of the spirit
level is centered. Refer to the 11 level feet in the following figure.
Summary of Contents for Green 21 PCT-90LH
Page 1: ...User Manual Model PCT 90LH Version 1 49 Full version English...
Page 2: ......
Page 127: ......
Page 128: ......