71
11.13
Checking the system
Once the energy storage system has been set up and connected, various system parameters must be checked.
11.13.1
Check on the homepage
No. Description
1
Home button
2
Info button
•
Click on the
Home button (1).
•
Click on the
Info button (2).
•
Check in the Info window whether errors are displayed.
Integrated network
à
house: XXXXXX Wh
House
à
integrated network: XXXXXX Wh
Converter AC
à
DC: 0 Wh
Cycle meter: XXX / XXX
Time until filter change: XXXX hours
Grid and plant error list:
No errors