Installing and connecting the energy storage
8.8
system
i
Use suitable fasteners!
(1)
Mark the positions of the upper right and left holes as
shown in Figure 14 "Dimensions on mounting plate
(
". (Position
1
in the drawing)
(2)
Remove the mounting plate with battery inverter from the
worksite.
Note:
No dust from drilling must be allowed to get in or on the
unit.
(3)
Drill holes at both positions and screw in the screws so
that there is a distance of approx. 3 mm between the wall
and screw head.
(4)
Remove the carrying straps from the mounting plate.
(5)
Install the mounting plate.
Note:
Make sure that the mounting plate slides down into the
keyholes.
(6)
Check that the mounting plate is level.
(7)
Mark the remaining 4 holes (position
2
in the drawing).
(8)
Remove the mounting plate.
(9)
Drill the four holes.
(10) Install the mounting plate.
(11) Screw the mounting plate to the wall securely.
Connect the current sensor (Figure 13) to the energy storage
system (Figure 15).
(1)
Insert the AC connector into the AC grid socket.
(2)
Insert the sensor cable and the network cable into the
corresponding sockets