
144
Subject to modification! Updated 12/2017
i
How to open the storage cabinet and
disassemble the components is described in
Chapter 11.4.
The battery modules should be in a charge
state of
20 to 30%
of their capacity.
If necessary, charge or discharge the battery
modules.
The battery modules must be commissioned
again by a qualified electrician certified by
VARTA Storage within 11 weeks after
removal.
i
Perform commissioning after relocation
according to Chapter
8.
Conformity with the relevant
EU Directives for the device is verified by the CE mark.
Declaration of Conformity (DoC)
The components used have been developed and manufactured in
compliance with applicable Directives and Standards.
The complete Declaration of Conformity is available on our
Internet page: www.varta-storage.com
This instruction manual is not to be construed as a contract. Subject
to errors, printing mistakes and modifications.