
Subject to modification! Updated 12/2017
113
G
ener
al
O
p
er
atio
n
Inst
all
atio
n
O
p
er
atio
n
(
S
e
rvi
ce
)
Ma
int
enan
c
e
i
When setting the parameters, the following
condition must be adhered to:
QUX1 ≤ QUX2 < QUX3 ≤ QUX4
Time delay:
Enter the time in s, after which the reactive
power is to be adjusted.
Minimum power:
Enter the minimum power in %, up to
which the reactive current is not controlled.
Figure 25: Q(U) characteristic