
68
Subject to modification! Updated 12/2017
WARNING
Improper installation!
Personal injury and material damage!
The fuse for the energy storage system
must meet the requirements for a
disconnecting device.
Fuse the device connection at the
energy storage system with a 16 A fuse
type B.
Observe the disconnect conditions in
accordance with VDE 0100-410.
Never connect the energy storage
system without a PE and N connection.
The system is intended to have a
permanent connection. Neutral and
phase must not be interchanged.
Otherwise, internal protection and
metering devices might not function.
A suitable separator must be installed
between power grid and customer
system (e.g. selective automatic cut-out
'SAC'), which can be used for all-poles
disconnection of the customer system
from the grid during maintenance work.
Observe the specified conductor cross-
sections.
For the position of the separators, see the connection
diagrams (Figures 1a/1b and 2a/2b) in the Appendix.