86
TriScroll 300 Dry Scroll Vacuum Pump
D
R
A
FT
4/
29
/0
4
Put the Pump Back into Service
The TriScroll 300 pump can be placed into service immediately after maintenance is complete.
However, 24 hours of run time is required before base pressure of 10 mTorr can be achieved.
3. Install the cowling over the pump module.
4. Secure it with the three M5x16 screws.
This figure illustrates a fully reassembled
TriScroll 300 pump.
NOTE
The 24 hour run time does not have to
be continuous. If your application
requires a low base pressure, it is wise
to run the pump for the 24-hour period
for optimum performance.
Final Assembly (continued)
Summary of Contents for TriScroll 300 Series
Page 4: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Page 10: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Page 12: ...2 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Maintenance Tool Kit ...
Page 13: ...3 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Maintenance Tool Kit continued ...
Page 16: ...6 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Tip Seal Tool Kit ...
Page 74: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Page 99: ......