19
TriScroll 300 Dry Scroll Vacuum Pump
D
RAFT 4/29/0
4
.
The parts removed from the orbiting plate are:
➀
Wave washer
➁
Nylon sleeve
➂
7305WN SU bearing
➃
J9104P bearing
➄
Orbiting spacer
31. Allow the orbiting plate to air cool until it
can be handled with bare hands.
This generally takes a few hours.
32. Remove and discard the shaft seal from the
orbiting plate.
TriScroll 300 Disassembly
(continued)
1
2
4
5
3
Summary of Contents for TriScroll 300 Series
Page 4: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Page 10: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Page 12: ...2 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Maintenance Tool Kit ...
Page 13: ...3 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Maintenance Tool Kit continued ...
Page 16: ...6 TriScroll 300 Dry Scroll Vacuum Pump D R A F T 4 2 9 0 4 Tip Seal Tool Kit ...
Page 74: ...TriScroll 300 Dry Scroll Vacuum Pump This page intentionally left blank D R A F T 4 2 9 0 4 ...
Page 99: ......