AIR N ARC
®
300 SERIES ALL-IN-ONE POWER SYSTEM
®
SECTION 4: INSTALLATION
090010-OP_r0
PAGE - 37
4.1 MACHINE PACKAGE RECEIPT/
INSPECTION
Upon receipt of the machine package, inspect the
exterior of the shipping crate for signs of shipping/transit
damage. Any damage should be reported immediately to
the shipping company. Open the lid and inspect the
component parts and supports to ensure that there has
been no internal movements of assemblies or
components which may have caused damage. To install
the 300 Series All-In-One Power System, refer to the
following sections:
4.2 MACHINE PACKAGE PREP
Refer to
Figure 4-1
and
Section 4.5, Installation and
Dimensions Diagram
, and the following instructions.
1. Remove packing and inspect the machine
and control panel for shipping damage.
2. Check fluid levels, if needed. Refer to
Section
6.5.3
for compressor oil, and
Section 6.5.13
for engine oil.
4.3 SERVICE BODY PREP
Consult
Section 3, Specifications
for dimension
requirements, and the following instructions.
System Component or
Part Group Task
Manual
Section
Location
Machine Package Prep
4.2
page 37
Service Body Prep
4.3
page 37
Machine Package Mounting
4.4
page 39
Installation and Dimensions Dia-
gram (Part 1 of 2)
4.5
page 42
Installation and Dimensions Dia-
gram (Part 2 of 2)
4.5
page 43
SECTION 4: INSTALLATION
DANGER
DO NOT install in enclosed spaces.
WARNING
ELECTRICAL HAZARD! Be sure the
battery is disconnected before starting
the installation.
NOTE
Contact Vanair at
(219) 879-5100 / (800) 526-8817
Service Fax: (219) 879-5335
www.vanair.com
to report missing items, incorrect part
numbers, or other discrepancies.
NOTE
Install electrical components (circuit
breakers, pressure switches, toggle
switches, etc.) in locations where
exposure to water or moisture will be
most minimized.
NOTE
In order to prevent accidental damage to
vehicle components (fuel tanks, lines,
brake lines, wiring harnesses), note their
location before drilling any holes.