SECTION 4: INSTALLATION
AIR N ARC
®
300 SERIES ALL-IN-ONE POWER SYSTEM
®
PAGE - 38
090034-OP_r0
4.2 AIR N ARC
®
300 SERIES ALL-IN-
ONE
®
MACHINE PACKAGE
PREPARATION
Refer to
Section 4.10
for the proper installation and
dimensions diagram
(note that the section contains two
parts/diagrams), and the following instructions.
1. Remove crate lid and packing.
2. Inspect the machine and control panel for
shipping damage.
Should any damage be discovered during package
inspection, contact the shipping company immediately.
4.3 GENERAL OVERVIEW OF
INSTALLATION
When determining the factors involved with the
installation of the Air N Arc 300 Series machine on a
vehicle, use this manual in tandem with the vehicle’s own
manual to get a feel for how the machine and its systems
need to integrate with the vehicle’s layout and systems.
Depending upon the customer-specified machine order,
an installation may include all or part of the following
major task list breakdown:
•
Machine mounting
•
Air tank mounting (skid-mounted model)
•
Instrument panel mounting
•
Connecting service and auxiliary lines, and
electronics
4.4 PREPARING THE VEHICLE
SERVICE BODY
NOTE
Although much of the information given
in this installation section is detailed,
these guidelines should be considered as
referential material only, due to the
diverse possibilities of the end user’s
vehicle make, model and year, and the
unit model specifications.
System Component or
Part Group Task
Manual
Section
Location
Preparing the Vehicle Service Body
4.4
page 38
continued on next page
NOTE
Read this manual before installing,
operating or servicing this
equipment. Failure to comply with
the operation and maintenance
instructions in this manual WILL
VOID THE EQUIPMENT
WARRANTY.