When determining the best location to mount the Air N
Arc 300 Series machine and also its remote components,
the following criteria must first be taken under
consideration:
•
Machine package dimensions: Refer to
Figure 4-10
for dimension measurements,
including auxiliary component dimensions,
where applicable..
•
Minimimal clearance allowances for the
purpose of cooling, ventilating and machine
access (in addition to each dimension of the
machine).
•
Free-flow allowance of fresh circulating air
for cooling purposes.
•
Remote component locations’ proximity to
machine (air tank, instrument panel, roof
[optional]).
•
Hindrance to any access, or operation of,
other standard or mounted vehicle
system(s), including any underdeck, or
chasis wiring, piping, etc.,
•
Clear pathways for route lines and wires,
which are free of sharp edges, sharp angles
and heat contact (if applicable).
•
Service output location.
Additional service body preparation includes the
following:
•
Ensure that the mounting surface for the
machine, as well as any remote
component(s), are level, cleared of debris,
and able to support the machine and/or its
component(s) after being mounted.
•
For particular load-bearing locations, if
necessary, additional support may be
Machine Clearance Allowance
4.4.1
page 40
Determining Proper Ventilation
Requirements
4.4.2
page 40
Roof Requirements (If Applicable)
4.4.3
page 40
System Component or
Part Group Task
Manual
Section
Location
CAUTION
When determining the proper machine
mounting location on the vehicle body,
always consider the location’s effect on
safe operation of the machine. Use the
guidelines given in Section 1, Safety to
verify an optimal, safe location before
permanently mounting the machine.